[Ariane 6] Successful first ignition of the Vulcain 2.1 engine
On 23 November 2023, teams from CNES, ArianeGroup and ESA successfully completed the long-duration hot-fire test of Ariane 6’s main stage on its launch pad at Europe’s spaceport.
[Ariane 6] Successful first ignition of the Vulcain 2.1 engine
On 23 November 2023, teams from CNES, ArianeGroup and ESA successfully completed the long-duration hot-fire test of Ariane 6’s main stage on its launch pad at Europe’s spaceport.
[Ariane 6] Successful first ignition of the Vulcain 2.1 engine
Ariane 6 is out !
As part of the combined testing campaign, Ariane 6's mobile gantry was retracted on 22 June.
Ariane 6 installed on its launch pad, with its fairing
Ariane 6 has achieved a new milestone: the launcher is fully assembled for the first time and installed on its launch pad.
Ariane 6 installed on its launch pad, with its fairing